Text modules, reading view and digital signature—also offline in the field.
Aa
FINISH PROTOCOL
PROTOCOL
SUMMARY
Handover Protocol xxTNv-QzHI-gL3-qtK7
|RENTPRO
Handover Protocol
Move-in documentation
Oakwood Drive Residence - Feb 12, 2026, 10:05
This handover protocol documents the condition of the object at the time of handover. It serves as a legally traceable source of evidence and information for the creator, the parties involved, and authorized third parties.
Share and create protocols via web link — no on-site appointment needed!
Self-service protocols let you create protocols without a personal appointment. Recipients get a link and capture details, photos and answers themselves in the browser. The finished protocol is imported automatically and ready to use straight away.
• Less effort for handovers, inspections and checks
• Participants capture the data themselves in the browser
• Uses your existing checklists and object structure
Mit diesem Webformular helfen Sie dabei, den Objektzustand übersichtlich zu dokumentieren. Bitte tragen Sie alle
Angaben sorgfältig und wahrheitsgemäß ein, damit die Dokumentation korrekt und aussagekräftig ist.
Stellen Sie sicher, dass Ihre persönlichen Daten korrekt sind.
2
Fotos und Checklisten
Dokumentieren Sie den aktuellen Zustand der Bereiche und die Ausstattung des Objekts mit eigenen Fotos und
bewerten Sie den Zustand nach den Checklisten.
3
Überprüfen und absenden
Ihre Eingaben werden in das finale Protokoll aufgenommen. Sie erhalten in Folge das finale Protokoll zur
Unterschrift vom Ersteller.
Tipp: Dies funktioniert am besten auf einem Smartphone – Sie können direkt Fotos aufnehmen.
From handover to return – in 6 steps
The professional solution for evidence-based asset documentation
app.deep.rent
Web console
Objects+ Create object
Stage Rig Set A
Event technology · Warehouse North
Lift platform HAB-12
Machine · Site West
Tool crate electrical
Tools · Storage East
Create appointment
Object
Stage Rig Set A
Event technology · Warehouse North, Augsburg
Occasion
Handover protocol
Assigned to
Alex Rivera
Start date
24 Mar 2026 · 11:30
Create assets and appointments on the PC
In the web console you create assets with location and contacts and schedule handover or maintenance appointments – conveniently on the desktop before on-site capture starts.
Machine yard Hall 1
Edit
Done
Photos
Checklist
Check each item and select the appropriate option.
Machines & drive
DEFECT
OK
OK
Hydraulics sealed
Drive running smoothly
Housing undamaged
SkipContinue & save
Stage tech & cabling
Equipment
Hubarbeitsbühne HAB-12
Quantity: 1
OK
Defects
Defect 1
Scratch on the housing of the lift platform
Customer
Capture the asset condition
Condition is captured with areas, accessories, checklists, photos and videos and damage. Data capture can be done offline.
Aa
FINISH PROTOCOL
PROTOCOL
SUMMARY
Handover protocol xxTNv-QzHI-gL3-qtK7
|ASSETPRO
Handover protocol
Handover documentation event technology
Stage Rig Set A - 12.02.26, 10:05
This handover protocol documents the condition of the asset at the time of handover. It serves as a legally traceable source of evidence for the owner, customer and authorised third parties.
Stage Rig Set A
Object:
Stage Rig Set A
Object ID:
AST-1204
Address:
Industriepark 12, 86150 Augsburg, Germany
Review the handover or maintenance protocol
The created protocol can then be reviewed by participants – on the creator’s device or via QR code on the participants’ own devices.
Alex Rivera
Asset manager
Signed on Feb 4, 2025, 2:32 PM
Sign digitally
Creator and participants sign the protocol directly on their devices with a digital signature. After signing, protocol data is stored on the device used and can be completed.
The protocol can be completed directly after signing. All protocol data and media are stored in the revision-safe S3 cloud archive and sent as a link to all participants – as a web page, PDF and printout.
Damage 1
Repair stage cable, damaged during teardown
£1,250.00
Damage 2
Hydraulic hose repair lift platform
£680.00
Damage 3
Return inspection fee
£120.00
Sum of damage costs incl. tax£2,050.00
- Deposit£5,000.00
= Result£2,950.00
PDF
Save PDF to archive
Updated: Feb 16, 2026, 6:20 PM
Created: Jan 17, 2026, 1:21 PM
Settle damage costs
For handovers with damage, costs and measures can be documented and settled in a structured way – based on the captured protocols and remediation of the recorded damage.
Assets & equipment need traceable condition records
Whether event technology, tool rental, infrastructure or special machinery: professional teams document handovers, checks and defects so they remain defensible later. deep.rent replaces paper, loose photos and media breaks with a digital process—from capture on site to PDF for everyone involved.
From small businesses to large enterprises – Protocol is used every day across many industries.
5.0
“We tried a lot of options and found the Protocol App to be the best solution for handovers.”
KB Katrin Brendel Estate agent, Sparkasse Karlsruhe ImmoCenter
“Handover protocols are now effortless. Our customers are thrilled with the service.”
DH Daniel Haller Managing director, Bajuwaren Living
“Handovers now take minutes — we would not want to be without it.”
TK Tina Krüger Property manager, Walter Krüger Finanzkonzepte
“Protocol has revolutionised our processes. We now create protocols in minutes instead of hours and keep everything securely in one place.”
ML Michael L. Head of Construction & Technology, PAMAX
“Creating the protocol went really well and was even fun. I never thought I would say that.”
FD Felix Drösel Managing director, Drösel Immo
“As estate agents and property managers we had been looking for a solution like this for a long time. Fast, simple and clear — everything in one app. Thank you for making everyday work easier.”